03-006
Tega Cay/Gold Hill Road Connector
Design Engineer
- Campco Engineering – Rock Hill, SC
Contractor
Schedule
- Design work began in June 2011
- A Public meeting will be required for this project
- Construction: March 2013 – December 2014
- Right-of-way acquisition should begin in Fall 2012
Status: